TF-104G DB+374 Jagdbombergeschwader 32 (JaboG 32) Lechfeld AB TF-104G, construction number 583F-5912, company model 583-10-20, built by Lockheed manufactured by Lockheed and Messerschmitt (ARGE-Süd); assembly according contract lot 3; fuselage assembled at Messerschmitt-Augsburg, wings manufactured at Messerschmitt-Manching ARGE-Süd parts (fuselage, wings and tail) airlifted to USA May 10, 1965 with a Canadair CL-44D airfreighter of "Flying Tiger Line" at Lockheed-Burbank assembled and test flights coded KF+212 at Palmdale in 1965; airlifted to Avio Diepen at Ypenburg, Netherlands on October 27, 1965 for reassembly camouflage scheme "Norm 62" according tech order "TA-196"; acceptance date December 27, 1965 by BABwFokker DB+374 JaboG 32 at Lechfeld AB delivery date on January 5, 1966 27+83 withdrawn from use and stored at LwSchleuse 11 on November 8, 1982 with 2.728 flight hours struck off charge order (AVA) March 4, 1983MAP (Military Assistance Program) to Hellenic Air Force (Elliniki Vassiliki Aeroporia) on July 26, 1988 coded "TF-5912" to 336 Mira (squadron); 1988 noted coded as "TF-912"; withdrawn from use 1993; stored Araxos AB in August 1995; dump October 2017 last noted. copyright © Peter Doll