F-104G with construction number "7092" on the Messerschmitt assembly line at Manching AB 1963 F-104G, construction number 683D-7092, company model 683-10-19, built by Messerschmitt (MTT) manufactured by South Group (ARGE-Süd); assembly in Fighterbomber version according contract lot 3 first flight July 25, 1963 coded KE+392; acceptance date by BABwMTT August 30, 1963 with 10:10 flight hours construction level "Zeus" as Fighterbomber (for MFG 1) with long range tanks installed, "AS.30" anti-ship missile wiring system and Vulcan M61 20 mm machine gun as loose part camouflage scheme "Norm 62" according tech order "TA-196" in 1963; LwVersRgt 3 on September 3, 1963 for upgrading and modifications VA+112 MFG 1 at Schleswig-Jagel AB delivery date on November 15, 1963 crashed on January 31, 1964 near Eckernförde after a midair collision with VA+111 (construction number 7091) over Schleswig-Holstein at high altitude (33.000 feet); pilot ejected safely; VA+112 collided with the leader on his 1st training flight in the F-104G struck off charge order (AVA) December 2, 1964. project "Zeus": 21 Fighterbomber from ARGE-Süd (MTT) for 1st Squadron of the Naval Air Wing 1 (MFG 1) at Schleswig-Jagel with long range tanks installed, AS.30 "Kormoran" wiring system and Vulcan M61 20 mm machine gun as loose part. copyright © Mühlböck archive